Services
Our Services
Quality Services

Solar Pile Installation
Bugallon Pangasinan Solar Farm with 60,120 piles installed at 620 above sea level for 120 days completion.

Structural on Piles
URC Balayan New Evaporator Structural
Framing at existing structure on
screw piles installed at refusal depth.

Outdoor Pile Installation
URC Cebu Plant expansion using screw piles installed at adjacent operational plant causing no vibration, no noise and no disruption of plant operation.

Pile Load Test
Static load test using reaction piles to be conducted to verify refusal depth and screw pile load capacity.

Consultancy
Site inspection and consultancy of Stake Holders and Structural Engineers in every project sites

Screw Pile Production
Fabrication works of screw piles production can be done at project site with adequate space and enough power supply.